Energy procurement
Demand Flexibility & Grid Services
Get paid to shift or reduce demand, or to export, when the grid needs it. Batteries, chargers, cold stores and generators can all earn.
When grid charges and flexibility value peak
Distribution charges have a "red band" of weekday peak hours. Shifting load out of it saves money, and flexibility services pay most at similar times.
Good candidates in logistics
- Depot chargers that can move charging by an hour or two
- Cold stores that can coast for short periods
- On-site batteries and backup generators
- Large HVAC and conveyor loads with some slack
What aggregators need from you
- Asset list with power ratings
- Operational limits you will not cross
- Metering and control access
- How revenue is shared
How it serves your logistics network
- Earn from depot chargers outside peak dispatch
- Monetise standby generators
- Turn cold-store thermal mass into revenue
Where flexible demand can earn
| Market | Run by | What you do |
|---|---|---|
| Balancing Mechanism | NESO | Change output or demand on instruction, usually via an aggregator |
| Frequency response | NESO | Respond within seconds to grid frequency; mainly batteries |
| Capacity Market | Government / NESO | Be available at times of system stress, for annual payments |
| Local flexibility | Your DNO | Reduce demand at local peak times |
| Demand Flexibility Service | NESO | Reduce demand in specific events when called |
Sources: NESO and Ofgem. Eligibility and minimum sizes vary; aggregators can pool smaller sites.
| Service | Typical range | Unit | Basis |
|---|---|---|---|
| Flexibility revenue, published examples | £8,000–£37,500 | per MW per year | Depends on asset type, availability and markets |
Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.
How we estimate carbon here
We use 0.131 kgCO₂e per kWh (UK grid electricity (location-based), DESNZ GHG conversion factors 2026), multiplied by the electricity your quote covers. Renewable contracts and PPAs can lower the market-based figure. It is an estimate for comparison, not a verified figure. Read the methodology.
Buy, own, rent, lease or contract?
Ways to get flexibility revenue
Service agreement with an aggregator
Opex, committed
Watch: Take-or-pay commitments, early-exit fees and indexation clauses. Match the term to how sure you are of demand.
Typical offers we request quotes from
Supplier names stay private until you choose a quote. One request goes to the suitable suppliers for your route, location and needs.
Flexibility aggregator
Earn from generators, batteries and flexible loads
- 900 MW+ under management
- All major markets
- No disruption beyond your limits
Flexibility software
Grid revenue from EV chargers and batteries
- Charger and battery integration
- Automatic dispatch
- Fleet-friendly limits
Offers describe the types of supplier we invite to quote. Prices are indicative and subject to supplier confirmation, availability and terms.
More in energy procurement
Fixed electricity
Lock in a unit rate and standing charge for one to three years, so you know what power will cost your sites.
ExploreFlexible procurement
For larger, half-hourly-metered users: buy energy in tranches against the wholesale market and manage risk with a strategy rather than one fixed price.
ExplorePPAs
Buy renewable power at a long-term price linked to a solar or wind project, on your site or elsewhere on the grid.
ExploreGreen tariffs & REGOs
Electricity contracts matched with Renewable Energy Guarantees of Origin, so you can report renewable supply for warehouses and data centres.
ExploreBusiness gas
Gas for space heating, cold-store defrost, CHP and backup generation: fixed or flexible contracts for single sites and portfolios.
ExploreFrequently asked questions
Will this disrupt operations?
It should not. You set the limits, and a good aggregator only dispatches within them.
Ready to compare quotes?
One short form. Suitable suppliers. Quotes in your inbox.