Prices & Carbon
GPU Compute & Data Centre Prices UK
Planning benchmarks for GPU cloud, colocation and GPU hardware in the UK, with what drives the price and how to compare quotes.
Monthly cost of one H100, five ways
Where the numbers come from
GPU prices come from public rental indices and published rate cards, converted from US dollars. Colocation and hardware ranges come from UK market guides and integrator prices. They are planning benchmarks, not quotes.
What moves the price
- GPU generation, memory and availability
- On-demand, spot or reserved terms
- Data-centre location, density and power availability
- Utilisation: idle capacity raises your real cost per useful hour
- Currency: most GPU clouds bill in dollars
How the compute benchmarks are built
| Item | Treatment |
|---|---|
| Currency | USD prices converted at about $1.33 to £1 |
| VAT | Excluded |
| GPU-hour prices | Published list prices and market medians, per GPU |
| Colocation | Per kW per month of committed power; space and cross-connects separate |
| Hardware | New and refurbished UK prices; shipping and installation excluded |
Prices move quickly in this market. Treat benchmarks as a starting point for quotes.
| Service | Typical range | Unit | Basis |
|---|---|---|---|
| H100 GPU-hour, market median | £2.35–£3.55 | per GPU-hour | Median of public rental indices, Sep–Nov 2026. Converted at ~$1.33/£ |
| H100 80GB on-demand, specialist cloud | £1.90–£3.40 | per GPU-hour | Excl. VAT, storage and egress. Converted from USD |
| H200 141GB on-demand | £2.70–£4.90 | per GPU-hour | Excl. VAT, storage and egress. Converted from USD |
| B200 on-demand | £2.60–£7.10 | per GPU-hour | Wide spread between marketplaces and clouds. Converted from USD |
| H100 on hyperscaler clouds (list) | £5.20–£9.25 | per GPU-hour | List prices; commitments and capacity blocks cost less |
| Dedicated 8× H100 bare-metal node | £11,000–£17,000 | per month | Derived from ~$2.50–$3.90 per GPU-hour × 730 hours |
| Single dedicated H100 | From £940 | per month (from) | Lowest published flat monthly rate, converted from USD |
| Colocation power, UK retail | £185–£380 | per kW per month | Excl. VAT. Cross-connects and remote hands usually extra |
| Standard rack, regional UK | £800–£1,500 | per rack per month | Excl. VAT; power allowance varies |
| Full cabinet, Slough or London Docklands | £1,600–£3,800 | per cabinet per month | Excl. VAT; power allowance varies |
| Cross-connect | £150–£480 | per connection per month | Excl. VAT |
| High-density racks, 20–50 kW | £230–£340 | per kW per month | Excl. VAT; contracted power |
| Liquid-cooled, 50 kW+ | £300–£420 | per kW per month | Excl. VAT; contracted power |
| 30 kW liquid-cooled rack | £2,000–£5,000 | per rack per month | Excl. VAT; London highest, regions lower |
| Wholesale / powered suite, 1 MW+ | £60–£150 | per kW per month | 5–15 year terms; strongly location and power dependent |
| Containerised data centre module | From £90,000 | per module (from) | Excl. IT, groundworks and grid connection |
| Single H100 GPU, new (in server) | £18,800–£30,000 | per GPU | Converted from USD; rarely sold standalone |
| 8× H100 HGX server, new | £188,000–£240,000 | per server | Fully configured; converted from USD |
| 8× B200 / B300 server, new | £300,000–£415,000 | per server | Fully configured; converted from USD |
| Refurbished H100 80GB | £13,500–£25,500 | per GPU | Warrantied refurbished; converted from USD |
| Used 8× H100 server | £113,000–£135,000 | per server | Converted from USD; condition varies |
| GPU-ready edge or rack server | From £8,800 | per server (from) | Entry configuration; GPUs extra. Excl. VAT |
Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.
More guides
Freight prices
Planning benchmarks for pallets, road haulage, sea and air freight, so you know roughly what to expect before you ask for quotes.
ExploreStorage & fulfilment prices
What UK businesses typically pay for pallet storage, handling and e-commerce fulfilment.
ExploreContainer prices
Typical UK prices to buy or hire dry and refrigerated containers, plus what to check before you buy.
ExploreCarbon methodology
A clear explanation of the emission factors and the simple calculation behind the carbon estimates in your quotes.
ExploreGetting accurate quotes
The details that make the biggest difference to quote accuracy, and how to compare quotes fairly.
ExplorePowering logistics automation
Every automated pick, optimised route and AI agent runs on compute, and every GPU runs on power. A practical guide to planning the stack from the warehouse floor to the grid connection.
ExploreBuy, rent, lease or contract
The same question comes up for containers, GPUs, data-centre space, solar panels and chargers: should you buy it, build it, rent it, lease it or sign a contract? Here is how to decide.
ExploreEnergy & charging prices
Planning benchmarks for buying power and building energy assets at UK warehouses, depots and data centres.
ExploreChoosing a freight forwarder
What a freight forwarder does, how forwarders charge, and what to check before you hand over your shipment.
ExplorePallets to Northern Ireland & Ireland
How pallets get from Great Britain to Northern Ireland and the Republic of Ireland, what paperwork applies, and why prices and transit times differ from the mainland.
ExploreGet quotes for these services
Ready to compare quotes?
One short form. Suitable suppliers. Quotes in your inbox.