Energy

Energy Procurement for Warehouses, Depots & Data Centres

Fixed or flexible contracts, PPAs, green tariffs and flexibility revenue. Tell us your sites and consumption and we will ask suppliers and brokers to quote.

Your unit rate

What makes up a business electricity price

Wholesale energyTraded market price
  • Bought by the supplier
  • Moves daily
Network chargesTransmission and distribution
  • Set by region and meter
  • Includes peak-time bands
Policy costsSchemes and levies
  • Renewables support
  • Balancing and capacity
Supplier costsOperating costs and margin
  • Plus broker fee if used
TaxesOn top
  • Climate Change Levy
  • VAT
Wholesale baseload in 2026 is about 9–11p per kWh, while the average business pays about 24p. Most of the difference is non-energy costs.

Choose an option

What makes up your unit rate

  • Wholesale energy, roughly 9–11p per kWh in 2026
  • Network and transmission charges
  • Policy costs and the Climate Change Levy
  • Supplier costs and margin

Fixed, flexible or PPA?

Fixed contracts give certainty for 1–3 years. Flexible procurement lets larger users buy in blocks over time. PPAs lock in a long-term price for renewable power and suit large, steady demand such as data centres and big distribution centres.

Have this ready

  • Your latest bill and MPAN or MPRN numbers
  • Annual consumption per site (kWh)
  • Half-hourly data if you have it
  • Contract end dates
Small business rules

Are you a "microbusiness"? It changes your protections

Ofgem treats a business as a microbusiness if it has fewer than 10 employees (or full-time equivalent) and an annual turnover or balance sheet of no more than £2 million, or if it uses no more than 100,000 kWh of electricity or 293,000 kWh of gas a year.

  • Suppliers must show broker (third-party intermediary) costs in the contract’s principal terms.
  • Micro and small businesses can take unresolved disputes to an approved redress scheme.
  • There is no cooling-off period once a business contract is agreed, so read the terms before you sign.

Source: Ofgem guidance for microbusinesses.

Indicative prices
ServiceTypical rangeUnitBasis
UK non-domestic electricity, average (Q2 2026)£0.24–£0.25per kWhDESNZ Q2 2026, all sizes; excl. and incl. CCL; excl. VAT
New fixed deal, SME meter£0.22–£0.30per kWhExcl. CCL and VAT; plus standing charge
New fixed deal, half-hourly supply£0.19–£0.24per kWhExcl. CCL and VAT; plus capacity and standing charges
Standing charge, SME£0.45–£0.65per dayLarger meters pay more
Wholesale baseload, calendar 2026£0.09–£0.11per kWhEnergy only, before network, policy and supplier costs
Virtual / utility-scale PPA strike£55–£75per MWhIndicative; anchored on CfD solar clearing prices
Sleeved PPA, delivered£0.11–£0.20per kWhYear 1; excludes supplier mark-up
On-site solar PPA, year 1£0.08–£0.22per kWhFalls with system size; often index-linked
REGO-backed renewable supplyQuoted on requestpremium per kWhVaries with technology, matching and volume
UK non-domestic gas, average£49–£53per MWhDESNZ Q1–Q2 2026, all sizes, excl. VAT
Flexibility revenue, published examples£8,000–£37,500per MW per yearDepends on asset type, availability and markets

Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.

How we estimate carbon here

We use 0.131 kgCO₂e per kWh (UK grid electricity (location-based), DESNZ GHG conversion factors 2026), multiplied by the electricity your quote covers. Renewable contracts and PPAs can lower the market-based figure. It is an estimate for comparison, not a verified figure. Read the methodology.

Buy, own, rent, lease or contract?

Ways to get energy procurement

Contract

Fixed 1–3 years, flexible 2–5 years, PPA 10–25 years

Opex, committed

Watch: Take-or-pay commitments, early-exit fees and indexation clauses. Match the term to how sure you are of demand.

Build & own

Generate part of your own power with on-site assets

Capex, long-term

Watch: Grid-connection lead times, planning consent, construction risk and the skills to operate it.

How to choose

Also in Energy

Frequently asked questions

When should I start looking?

Three to six months before your contract ends. Out-of-contract and deemed rates are usually much higher.

Are broker fees hidden in the price?

We ask suppliers and brokers to show any commission included in their quote, so you can compare like for like.

Ready to compare quotes?

One short form. Suitable suppliers. Quotes in your inbox.

Get quotes