Compute
Compute for Logistics: GPUs, Data Centres & AI Hardware
The automation and AI models that run your warehouses, fleets and routes need compute. Compare GPU cloud, data centre space and hardware, and decide whether to rent, contract, lease or buy.
At a Glance
- CategoriesGPU compute, data centres, compute hardware
- Subcategories13 vendor-neutral options
- H100 GPU-hour (market)~£2.35–£3.55
- Colocation power~£185–£380 per kW per month
- Ways to buyRent, contract, lease, buy or build
Match the way you buy compute to how you use it
GPU compute
Compute is now critical infrastructure for AI-powered businesses, but GPU supply is tight and prices move fast. Describe your workload once and get competing quotes from leading GPU providers.
OverviewOn-demand GPUs
Spin up one GPU or a full 8-GPU node by the hour for experiments, fine-tuning and burst inference. Stop paying when you stop.
ExploreReserved clusters
Commit to a block of GPUs for months or years and get a lower rate, guaranteed capacity and multi-node networking.
ExploreServerless inference
Deploy a model behind an API endpoint and pay only for what you use. The provider handles GPUs, scaling and uptime.
ExploreBare-metal GPUs
A whole physical GPU server, rented by the month and managed by the provider. Full performance, no noisy neighbours, no capex.
ExploreUK-sovereign GPUs
GPU capacity hosted in UK data centres by UK-operated providers, for customer, shipment and security data that must stay onshore.
ExploreData centres
Somewhere secure, powered and connected for your servers: from a single rack for your WMS to liquid-cooled AI racks and containerised units at the depot.
OverviewRacks & cabinets
Space, power and connectivity for your own servers in a professionally run data centre, by the rack or part-rack.
ExploreAI-ready colocation
Racks built for GPU servers: high power per rack, liquid or rear-door cooling, and floors strong enough to carry them.
ExploreWholesale & powered suites
A dedicated hall, suite or powered shell from about 1 MW upwards, for large private clouds and AI clusters on 5–15 year terms.
ExploreModular edge DCs
A complete small data centre in a shipping-container-sized module: racks, power, cooling and security, delivered to your depot or yard.
ExploreCompute hardware
Own dedicated access to hardware for your models to run and train. Buy new from UK integrators, save with warrantied refurbished GPUs, or lease to spread the cost.
OverviewNew GPU servers
New, warrantied GPU servers configured for training or inference, supplied by UK integrators and NVIDIA partners.
ExploreRefurbished GPUs
Previous-generation data-centre GPUs and servers, tested and warrantied, at a fraction of new prices. Well suited to inference and fine-tuning.
ExploreGPU leasing
Spread the cost of servers, storage and networking over a fixed term, refresh to new GPUs, and keep cash for the rest of the business.
ExploreEdge AI servers
Compact GPU servers that sit in your warehouse, yard or depot to run vision, robotics and automation with low latency, even if the internet drops.
ExploreWhy logistics needs compute
Route optimisation, demand forecasting, computer vision at the dock door, warehouse robots and AI agents that answer customers all run on GPUs. Some of it belongs in the cloud, some at the edge in your warehouse, and some in a data centre near your network.
Where each workload usually runs
- Training and fine-tuning models: reserved GPU clusters or on-demand cloud
- Live inference for apps and agents: serverless inference or dedicated GPUs
- Vision and robotics in the warehouse: edge AI servers on site
- Steady, high-utilisation workloads: your own servers in colocation
Compute needs power
Every GPU-hour is electricity. A single 8-GPU server draws around 10–15 kW, so hosting your own hardware means thinking about power contracts, backup and carbon. Energy is the other half of the decision.
From logistics to compute
What your logistics operation needs from compute
| Logistics service | Compute option | Why |
|---|---|---|
| Pallets | Serverless inference | Booking and tracking automation |
| Road Freight | On-demand GPUs | Route optimisation and ETA models |
| International Freight | Serverless inference | Customs document extraction and classification |
| International Freight | UK-sovereign GPUs | Keep customs and shipment data onshore |
| Warehousing | Edge AI servers | Vision, robotics and automation in the warehouse |
| Fulfilment | Serverless inference | Order-tracking chatbots and document AI |
| Fulfilment | Edge AI servers | Pick, pack and dimensioning automation |
| Containers | Modular edge DCs | Container-format data centres for depots and ports |
Buy, own, rent, lease or contract?
Every way to acquire, side by side
| Option | Fits when | Watch out for | Cost profile |
|---|---|---|---|
| RentPay as you go, by the hour, day or month. Nothing to own or maintain. | Demand is spiky or uncertain, you are running a pilot, or utilisation would be under about 40%. | Highest unit price. Capacity is not guaranteed at peak. Check storage, data egress and minimum terms. | Opex, no commitment |
| ContractCommit to capacity or a price for a fixed term: reserved GPUs, colocation, fixed energy deals or PPAs. | Your load is steady and predictable for 1–15 years and you want a lower, fixed unit price. | Take-or-pay commitments, early-exit fees and indexation clauses. Match the term to how sure you are of demand. | Opex, committed |
| Lease or financeUse the asset on your own site or in your rack and pay monthly, without buying it outright. | You want control of the hardware or equipment but prefer to protect cash and refresh every 2–3 years. | Know whether it is an operating (FMV) or finance lease, what happens at end of term, and who carries residual-value risk. | Opex or capex, monthly |
| BuyPurchase the asset outright, new or refurbished, and run it yourself. | Utilisation will stay high (roughly 60–70%+) over 3+ years, or you need full control of data and location. | Upfront capex, depreciation and obsolescence. You still need space, power, cooling and people to run it. | Capex |
| Build & ownDevelop infrastructure yourself: your own solar array, data hall, private wire or grid connection. | You have a large, long-term need, control of the site, and the appetite to manage delivery. | Grid-connection lead times, planning consent, construction risk and the skills to operate it. | Capex, long-term |
| SubscribeA monthly or annual plan that buys and retires credits for you, often priced per employee or per tonne. | You are a small business that wants a simple, predictable way to start, with certificates for your records. | Check exactly which credits are retired, in whose name, and whether the plan supports the claim you want to make. | Opex, monthly or annual |
Compute runs on power
Warehouses, depots, electric fleets and data centres all run on electricity. Compare contracts, PPAs, solar, batteries, charging and backup power, and decide whether to buy, own, lease or contract.
Explore EnergyWhere UK data-centre capacity is
| Area | Known for |
|---|---|
| Slough and West London | The UK’s largest cluster; dense connectivity and cloud regions |
| London Docklands | Network hubs and internet exchanges; low-latency finance and carriers |
| Manchester and the North West | The largest market outside London; northern connectivity |
| South Wales and the Midlands | Larger sites and grid capacity for wholesale and AI builds |
| Scotland | Renewable power and cooler climate; growing AI capacity |
Overview of the main UK markets. Available power varies site by site.
Frequently asked questions
Do I need my own GPUs?
Usually not at first. Renting on demand is the cheapest way to start. Buying starts to pay when your GPUs will be busy most of the time for several years.
Can you source UK-only or sovereign capacity?
Yes. Tell us about data-residency or security requirements in your request and we will only invite providers that can meet them.
Ready to compare quotes?
One short form. Suitable suppliers. Quotes in your inbox.
