Compute
Data Centres & Colocation
Somewhere secure, powered and connected for your servers: from a single rack for your WMS to liquid-cooled AI racks and containerised units at the depot.
Uptime tiers: maximum expected downtime per year
Choose an option
Racks & cabinets
Space, power and connectivity for your own servers in a professionally run data centre, by the rack or part-rack.
ExploreAI-ready colocation
Racks built for GPU servers: high power per rack, liquid or rear-door cooling, and floors strong enough to carry them.
ExploreWholesale & powered suites
A dedicated hall, suite or powered shell from about 1 MW upwards, for large private clouds and AI clusters on 5–15 year terms.
ExploreModular edge DCs
A complete small data centre in a shipping-container-sized module: racks, power, cooling and security, delivered to your depot or yard.
ExplorePricing is mostly about power
Colocation is now priced mainly per kilowatt of contracted power. Space, cooling and a share of the building's resilience are bundled in. Cross-connects, remote hands and extra power are often billed separately.
Location matters
Slough and West London are the best connected but the most grid-constrained. Manchester, Edinburgh and South Wales can be cheaper and have more power available. For logistics, a site near your hubs and fibre routes can matter more than the headline rate.
What to include in a request
- IT load now and in 2–3 years (kW)
- Rack count and density
- Cooling: air, rear-door or liquid
- Connectivity and cloud on-ramps
- Term and start date
Why PUE shows up on your bill
Power usage effectiveness (PUE) is total facility power divided by IT power. A PUE of 1.4 means every 1 kW of servers needs 0.4 kW more for cooling and losses. Many colocation contracts recharge power at metered usage × PUE, or price it into a per-kW rate.
| 100 kW of IT running all year | PUE 1.2 | PUE 1.4 | PUE 1.6 |
|---|---|---|---|
| Total energy | 1,051 MWh | 1,226 MWh | 1,402 MWh |
| Cost at 24p per kWh | ≈ £252k | ≈ £294k | ≈ £336k |
| Emissions at 0.131 kgCO₂e/kWh | ≈ 138 t | ≈ 161 t | ≈ 184 t |
Calculated: 100 kW × 8,760 hours × PUE. Grid factor: DESNZ 2026 (location-based).
| Service | Typical range | Unit | Basis |
|---|---|---|---|
| Colocation power, UK retail | £185–£380 | per kW per month | Excl. VAT. Cross-connects and remote hands usually extra |
| Standard rack, regional UK | £800–£1,500 | per rack per month | Excl. VAT; power allowance varies |
| Full cabinet, Slough or London Docklands | £1,600–£3,800 | per cabinet per month | Excl. VAT; power allowance varies |
| Cross-connect | £150–£480 | per connection per month | Excl. VAT |
| High-density racks, 20–50 kW | £230–£340 | per kW per month | Excl. VAT; contracted power |
| Liquid-cooled, 50 kW+ | £300–£420 | per kW per month | Excl. VAT; contracted power |
| 30 kW liquid-cooled rack | £2,000–£5,000 | per rack per month | Excl. VAT; London highest, regions lower |
| Wholesale / powered suite, 1 MW+ | £60–£150 | per kW per month | 5–15 year terms; strongly location and power dependent |
| Containerised data centre module | From £90,000 | per module (from) | Excl. IT, groundworks and grid connection |
Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.
How we estimate carbon here
We use 0.131 kgCO₂e per kWh (UK grid electricity (location-based), DESNZ GHG conversion factors 2026), multiplied by the electricity your quote covers. Renewable contracts and PPAs can lower the market-based figure. It is an estimate for comparison, not a verified figure. Read the methodology.
Buy, own, rent, lease or contract?
Ways to get data centres
12–36 months retail, 5–15 years wholesale
Opex, committed
Watch: Take-or-pay commitments, early-exit fees and indexation clauses. Match the term to how sure you are of demand.
Only at very large scale with a secured grid connection
Capex, long-term
Watch: Grid-connection lead times, planning consent, construction risk and the skills to operate it.
Also in Compute
GPU compute
Compute is now critical infrastructure for AI-powered businesses, but GPU supply is tight and prices move fast. Describe your workload once and get competing quotes from leading GPU providers.
ExploreCompute hardware
Own dedicated access to hardware for your models to run and train. Buy new from UK integrators, save with warrantied refurbished GPUs, or lease to spread the cost.
ExploreFrequently asked questions
Is high-density more expensive?
Per rack, yes. Per kW it is often similar or lower, because fixed costs are spread over more power.
How long does it take to get space?
Standard racks can be ready in weeks. High-density and MW-scale capacity can take months, depending on power availability.
Ready to compare quotes?
One short form. Suitable suppliers. Quotes in your inbox.