Planning benchmarks for buying power and building energy assets at UK warehouses, depots and data centres.
Business power prices compared, in pence per kWh
Where the numbers come from
Electricity and gas averages are from the Government's quarterly energy price statistics. Contract, PPA, solar, storage and charger ranges come from UK market guides and installer price lists. They are planning benchmarks, not quotes.
What moves the price
- Wholesale market and contract timing
- Site size, meter type and consumption profile
- Roof, ground and grid-connection conditions
- Grants and capital allowances
- Term length and who carries the risk
Energy units and quick conversions
| Conversion | Value |
|---|---|
| £ per MWh to pence per kWh | Divide by 10 (£65/MWh = 6.5p/kWh) |
| 1 MWh | 1,000 kWh |
| kVA to kW (typical) | kW ≈ kVA × 0.8 to 0.95, depending on power factor |
| Solar yield | About 850–1,100 kWh per kWp per year in the UK |
| Grid carbon (2026) | 0.131 kgCO₂e per kWh (DESNZ, location-based) |
Sources: DESNZ, ActivoGo benchmarks.
| Service | Typical range | Unit | Basis |
|---|---|---|---|
| UK non-domestic electricity, average (Q2 2026) | £0.24–£0.25 | per kWh | DESNZ Q2 2026, all sizes; excl. and incl. CCL; excl. VAT |
| New fixed deal, SME meter | £0.22–£0.30 | per kWh | Excl. CCL and VAT; plus standing charge |
| New fixed deal, half-hourly supply | £0.19–£0.24 | per kWh | Excl. CCL and VAT; plus capacity and standing charges |
| Standing charge, SME | £0.45–£0.65 | per day | Larger meters pay more |
| Wholesale baseload, calendar 2026 | £0.09–£0.11 | per kWh | Energy only, before network, policy and supplier costs |
| Virtual / utility-scale PPA strike | £55–£75 | per MWh | Indicative; anchored on CfD solar clearing prices |
| Sleeved PPA, delivered | £0.11–£0.20 | per kWh | Year 1; excludes supplier mark-up |
| On-site solar PPA, year 1 | £0.08–£0.22 | per kWh | Falls with system size; often index-linked |
| UK non-domestic gas, average | £49–£53 | per MWh | DESNZ Q1–Q2 2026, all sizes, excl. VAT |
| Flexibility revenue, published examples | £8,000–£37,500 | per MW per year | Depends on asset type, availability and markets |
| Commercial rooftop solar, installed | £700–£1,100 | per kWp | Excl. VAT; falls with system size |
| 500 kWp warehouse roof system | £350,000–£550,000 | per system | Excl. VAT and roof remediation |
| Commercial battery, installed | £350–£700 | per kWh usable | Excl. VAT; larger systems cheaper per kWh |
| Grid-service revenue via aggregator | £30–£90 | per kWh per year | Systems over ~100 kWh; shared with aggregator |
| 22 kW AC charger, installed | £1,800–£3,500 | per socket | Excl. VAT, grid upgrades and grants |
| 50 kW DC rapid charger | £14,000–£35,000 | per unit | Installed; excl. VAT and grid upgrades |
| 150 kW DC charger (HGV depot) | £45,000–£80,000 | per unit | Installed; excl. VAT and grid upgrades |
| 10-truck HGV depot, all-in | £650,000–£1,400,000 | per site | Equipment, civils, HV connection and load management |
| Generator hire, SME sizes | £40–£150 | per day | Weekly and monthly hire cheaper per day; fuel extra |
| Industrial generator hire, 200 kVA+ | From £500 | per day (from) | Delivery, fuel and installation extra |
| Small commercial connection | £500–£3,000 | per connection | Excl. VAT; 5–20 working days typical |
| Medium commercial connection | £2,000–£15,000 | per connection | Excl. VAT |
| HV connection to major reinforcement | £50,000–£2,000,000 | per project | Highly site-specific |
Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.
More guides
Freight prices
Planning benchmarks for pallets, road haulage, sea and air freight, so you know roughly what to expect before you ask for quotes.
ExploreStorage & fulfilment prices
What UK businesses typically pay for pallet storage, handling and e-commerce fulfilment.
ExploreContainer prices
Typical UK prices to buy or hire dry and refrigerated containers, plus what to check before you buy.
ExploreCarbon methodology
A clear explanation of the emission factors and the simple calculation behind the carbon estimates in your quotes.
ExploreGetting accurate quotes
The details that make the biggest difference to quote accuracy, and how to compare quotes fairly.
ExplorePowering logistics automation
Every automated pick, optimised route and AI agent runs on compute, and every GPU runs on power. A practical guide to planning the stack from the warehouse floor to the grid connection.
ExploreBuy, rent, lease or contract
The same question comes up for containers, GPUs, data-centre space, solar panels and chargers: should you buy it, build it, rent it, lease it or sign a contract? Here is how to decide.
ExploreGPU & data centre prices
Planning benchmarks for GPU cloud, colocation and GPU hardware in the UK, with what drives the price and how to compare quotes.
ExploreChoosing a freight forwarder
What a freight forwarder does, how forwarders charge, and what to check before you hand over your shipment.
ExplorePallets to Northern Ireland & Ireland
How pallets get from Great Britain to Northern Ireland and the Republic of Ireland, what paperwork applies, and why prices and transit times differ from the mainland.
ExploreGet quotes for these services
Ready to compare quotes?
One short form. Suitable suppliers. Quotes in your inbox.