Prices & Carbon

Business Energy, Solar & Charging Prices UK

Planning benchmarks for buying power and building energy assets at UK warehouses, depots and data centres.

Price ladder

Business power prices compared, in pence per kWh

Virtual PPA strike price5.5–7.5p
Wholesale baseload (2026)9–11p
On-site solar PPA, year 18–22p
Sleeved PPA, delivered11–20p
New fixed deal, half-hourly19–24p
New fixed deal, SME meter22–30p
Average business price (Q2 2026)≈ 24p
0p5p10p15p20p25p30pp per kWh
ActivoGo benchmarks, excl. VAT and CCL. A virtual PPA hedges the wholesale price only; network and policy costs are paid separately.

Where the numbers come from

Electricity and gas averages are from the Government's quarterly energy price statistics. Contract, PPA, solar, storage and charger ranges come from UK market guides and installer price lists. They are planning benchmarks, not quotes.

What moves the price

  • Wholesale market and contract timing
  • Site size, meter type and consumption profile
  • Roof, ground and grid-connection conditions
  • Grants and capital allowances
  • Term length and who carries the risk
Conversions

Energy units and quick conversions

ConversionValue
£ per MWh to pence per kWhDivide by 10 (£65/MWh = 6.5p/kWh)
1 MWh1,000 kWh
kVA to kW (typical)kW ≈ kVA × 0.8 to 0.95, depending on power factor
Solar yieldAbout 850–1,100 kWh per kWp per year in the UK
Grid carbon (2026)0.131 kgCO₂e per kWh (DESNZ, location-based)

Sources: DESNZ, ActivoGo benchmarks.

Indicative prices
ServiceTypical rangeUnitBasis
UK non-domestic electricity, average (Q2 2026)£0.24–£0.25per kWhDESNZ Q2 2026, all sizes; excl. and incl. CCL; excl. VAT
New fixed deal, SME meter£0.22–£0.30per kWhExcl. CCL and VAT; plus standing charge
New fixed deal, half-hourly supply£0.19–£0.24per kWhExcl. CCL and VAT; plus capacity and standing charges
Standing charge, SME£0.45–£0.65per dayLarger meters pay more
Wholesale baseload, calendar 2026£0.09–£0.11per kWhEnergy only, before network, policy and supplier costs
Virtual / utility-scale PPA strike£55–£75per MWhIndicative; anchored on CfD solar clearing prices
Sleeved PPA, delivered£0.11–£0.20per kWhYear 1; excludes supplier mark-up
On-site solar PPA, year 1£0.08–£0.22per kWhFalls with system size; often index-linked
UK non-domestic gas, average£49–£53per MWhDESNZ Q1–Q2 2026, all sizes, excl. VAT
Flexibility revenue, published examples£8,000–£37,500per MW per yearDepends on asset type, availability and markets
Commercial rooftop solar, installed£700–£1,100per kWpExcl. VAT; falls with system size
500 kWp warehouse roof system£350,000–£550,000per systemExcl. VAT and roof remediation
Commercial battery, installed£350–£700per kWh usableExcl. VAT; larger systems cheaper per kWh
Grid-service revenue via aggregator£30–£90per kWh per yearSystems over ~100 kWh; shared with aggregator
22 kW AC charger, installed£1,800–£3,500per socketExcl. VAT, grid upgrades and grants
50 kW DC rapid charger£14,000–£35,000per unitInstalled; excl. VAT and grid upgrades
150 kW DC charger (HGV depot)£45,000–£80,000per unitInstalled; excl. VAT and grid upgrades
10-truck HGV depot, all-in£650,000–£1,400,000per siteEquipment, civils, HV connection and load management
Generator hire, SME sizes£40–£150per dayWeekly and monthly hire cheaper per day; fuel extra
Industrial generator hire, 200 kVA+From £500per day (from)Delivery, fuel and installation extra
Small commercial connection£500–£3,000per connectionExcl. VAT; 5–20 working days typical
Medium commercial connection£2,000–£15,000per connectionExcl. VAT
HV connection to major reinforcement£50,000–£2,000,000per projectHighly site-specific

Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.

More guides

Freight prices

Planning benchmarks for pallets, road haulage, sea and air freight, so you know roughly what to expect before you ask for quotes.

Explore

Storage & fulfilment prices

What UK businesses typically pay for pallet storage, handling and e-commerce fulfilment.

Explore

Container prices

Typical UK prices to buy or hire dry and refrigerated containers, plus what to check before you buy.

Explore

Carbon methodology

A clear explanation of the emission factors and the simple calculation behind the carbon estimates in your quotes.

Explore

Getting accurate quotes

The details that make the biggest difference to quote accuracy, and how to compare quotes fairly.

Explore

Powering logistics automation

Every automated pick, optimised route and AI agent runs on compute, and every GPU runs on power. A practical guide to planning the stack from the warehouse floor to the grid connection.

Explore

Buy, rent, lease or contract

The same question comes up for containers, GPUs, data-centre space, solar panels and chargers: should you buy it, build it, rent it, lease it or sign a contract? Here is how to decide.

Explore

GPU & data centre prices

Planning benchmarks for GPU cloud, colocation and GPU hardware in the UK, with what drives the price and how to compare quotes.

Explore

Choosing a freight forwarder

What a freight forwarder does, how forwarders charge, and what to check before you hand over your shipment.

Explore

Pallets to Northern Ireland & Ireland

How pallets get from Great Britain to Northern Ireland and the Republic of Ireland, what paperwork applies, and why prices and transit times differ from the mainland.