GPU compute

Reserved GPU Clusters

Commit to a block of GPUs for months or years and get a lower rate, guaranteed capacity and multi-node networking.

Buying process

How a reserved cluster is usually bought

  1. 1
    Define the workloadWeek 1

    Model sizes, training runs, inference volume, data location.

  2. 2
    Size the clusterWeek 1–2

    GPU count and type, interconnect, storage, term.

  3. 3
    Request proposalsWeek 2–4

    Comparable quotes on price, start date and service levels.

  4. 4
    BenchmarkDays

    Run a test job on the provider’s hardware if possible.

  5. 5
    Contract and onboardWeeks

    Take-or-pay commitment, access, monitoring, support.

Large clusters can need months of lead time, so start early if you have a fixed training date.

When reserved beats on-demand

If you would keep on-demand GPUs running most of the month anyway, a reservation usually costs less and guarantees the capacity is there when you need it.

What to negotiate

  • Start date and ramp-up schedule
  • Price per GPU-hour and any indexation
  • Storage, networking and support included
  • Early termination and upgrade rights, for example H100 to B200
  • Data-centre location and certifications

How it serves your logistics network

  • Retrain network-wide forecasting models every week
  • Run vision models for many sites from one cluster
  • Host a production AI agent with guaranteed capacity
Interconnect

Why networking matters in a cluster

Training across many GPUs spends much of its time exchanging data. Fast links inside each server and between servers stop expensive GPUs sitting idle.

LinkWhereTypical speed
NVLink (4th gen, H100)Between GPUs inside a server900 GB/s per GPU
InfiniBand NDRBetween servers400 Gb/s per port
Ethernet with RoCEBetween servers400 Gb/s per port on current fabrics
Storage networkTo shared datasets and checkpointsVaries; ask for throughput per node

Source: NVIDIA and InfiniBand Trade Association specifications. Note that GB/s (bytes) and Gb/s (bits) differ by a factor of eight.

Indicative prices
ServiceTypical rangeUnitBasis
Reserved GPU cluster, 1–36 monthsQuoted on requestper GPU-hourPriced per cluster; usually below on-demand

Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.

How we estimate carbon here

We use 0.17 kgCO₂e per GPU-hour (GPU-hour on the UK grid (estimate), ActivoGo estimate using DESNZ 2026), multiplied by the GPU-hours in your quote. Renewable contracts and PPAs can lower the market-based figure. It is an estimate for comparison, not a verified figure. Read the methodology.

Buy, own, rent, lease or contract?

Ways to get reserved clusters

Contract

Steady load for 6+ months

Opex, committed

Watch: Take-or-pay commitments, early-exit fees and indexation clauses. Match the term to how sure you are of demand.

Rent

Bridge capacity until the cluster is live

Opex, no commitment

Watch: Highest unit price. Capacity is not guaranteed at peak. Check storage, data egress and minimum terms.

How to choose

Typical offers we request quotes from

Supplier names stay private until you choose a quote. One request goes to the suitable suppliers for your route, location and needs.

Offer A

European AI cloud

Reserved H200 and Blackwell clusters

Indicative price
Quoted per cluster
Timing
Weeks
Coverage
EU data centres
  • InfiniBand networking
  • Managed Kubernetes and Slurm
  • Startup credit schemes
Request this quote
Offer B

Large-scale AI cloud

Dedicated multi-node GPU clusters

Indicative price
Quoted per cluster
Timing
Weeks to months
Coverage
US & Europe
  • Hundreds to thousands of GPUs
  • High-performance storage
  • Enterprise SLAs
Request this quote
Offer C

UK-headquartered GPU cloud

Single-tenant H100 to Blackwell clusters

Indicative price
Quoted per cluster
Timing
Weeks
Coverage
UK, Europe and beyond
  • NVIDIA Cloud Partner
  • 24/7 SRE operations
  • UK sites available
Request this quote

Offers describe the types of supplier we invite to quote. Prices are indicative and subject to supplier confirmation, availability and terms.

More in GPU compute

Frequently asked questions

Can we start small and grow?

Many providers offer ramp schedules. Say how many GPUs you need now and in 6–12 months.

Ready to compare quotes?

One short form. Suitable suppliers. Quotes in your inbox.

Get quotes