GPU compute
Reserved GPU Clusters
Commit to a block of GPUs for months or years and get a lower rate, guaranteed capacity and multi-node networking.
How a reserved cluster is usually bought
- 1Define the workloadWeek 1
Model sizes, training runs, inference volume, data location.
- 2Size the clusterWeek 1–2
GPU count and type, interconnect, storage, term.
- 3Request proposalsWeek 2–4
Comparable quotes on price, start date and service levels.
- 4BenchmarkDays
Run a test job on the provider’s hardware if possible.
- 5Contract and onboardWeeks
Take-or-pay commitment, access, monitoring, support.
When reserved beats on-demand
If you would keep on-demand GPUs running most of the month anyway, a reservation usually costs less and guarantees the capacity is there when you need it.
What to negotiate
- Start date and ramp-up schedule
- Price per GPU-hour and any indexation
- Storage, networking and support included
- Early termination and upgrade rights, for example H100 to B200
- Data-centre location and certifications
How it serves your logistics network
- Retrain network-wide forecasting models every week
- Run vision models for many sites from one cluster
- Host a production AI agent with guaranteed capacity
Why networking matters in a cluster
Training across many GPUs spends much of its time exchanging data. Fast links inside each server and between servers stop expensive GPUs sitting idle.
| Link | Where | Typical speed |
|---|---|---|
| NVLink (4th gen, H100) | Between GPUs inside a server | 900 GB/s per GPU |
| InfiniBand NDR | Between servers | 400 Gb/s per port |
| Ethernet with RoCE | Between servers | 400 Gb/s per port on current fabrics |
| Storage network | To shared datasets and checkpoints | Varies; ask for throughput per node |
Source: NVIDIA and InfiniBand Trade Association specifications. Note that GB/s (bytes) and Gb/s (bits) differ by a factor of eight.
| Service | Typical range | Unit | Basis |
|---|---|---|---|
| Reserved GPU cluster, 1–36 months | Quoted on request | per GPU-hour | Priced per cluster; usually below on-demand |
Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.
How we estimate carbon here
We use 0.17 kgCO₂e per GPU-hour (GPU-hour on the UK grid (estimate), ActivoGo estimate using DESNZ 2026), multiplied by the GPU-hours in your quote. Renewable contracts and PPAs can lower the market-based figure. It is an estimate for comparison, not a verified figure. Read the methodology.
Buy, own, rent, lease or contract?
Ways to get reserved clusters
Steady load for 6+ months
Opex, committed
Watch: Take-or-pay commitments, early-exit fees and indexation clauses. Match the term to how sure you are of demand.
Bridge capacity until the cluster is live
Opex, no commitment
Watch: Highest unit price. Capacity is not guaranteed at peak. Check storage, data egress and minimum terms.
Typical offers we request quotes from
Supplier names stay private until you choose a quote. One request goes to the suitable suppliers for your route, location and needs.
European AI cloud
Reserved H200 and Blackwell clusters
- InfiniBand networking
- Managed Kubernetes and Slurm
- Startup credit schemes
Large-scale AI cloud
Dedicated multi-node GPU clusters
- Hundreds to thousands of GPUs
- High-performance storage
- Enterprise SLAs
UK-headquartered GPU cloud
Single-tenant H100 to Blackwell clusters
- NVIDIA Cloud Partner
- 24/7 SRE operations
- UK sites available
Offers describe the types of supplier we invite to quote. Prices are indicative and subject to supplier confirmation, availability and terms.
More in GPU compute
On-demand GPUs
Spin up one GPU or a full 8-GPU node by the hour for experiments, fine-tuning and burst inference. Stop paying when you stop.
ExploreServerless inference
Deploy a model behind an API endpoint and pay only for what you use. The provider handles GPUs, scaling and uptime.
ExploreBare-metal GPUs
A whole physical GPU server, rented by the month and managed by the provider. Full performance, no noisy neighbours, no capex.
ExploreUK-sovereign GPUs
GPU capacity hosted in UK data centres by UK-operated providers, for customer, shipment and security data that must stay onshore.
ExploreFrequently asked questions
Can we start small and grow?
Many providers offer ramp schedules. Say how many GPUs you need now and in 6–12 months.