Compute hardware
New GPU Servers (HGX & RTX PRO)
New, warrantied GPU servers configured for training or inference, supplied by UK integrators and NVIDIA partners.
GPU memory per card, by generation
Which platform?
- HGX 8-GPU: training and large-model inference
- RTX PRO servers: inference, vision and simulation at lower cost
- Edge servers: 1–4 GPUs for sites and depots
Before you order
- Confirm hosting, power and cooling are ready
- Check networking (InfiniBand or Ethernet) for multi-node
- Ask about proof-of-concept access before buying
- Agree delivery, installation and support terms
How it serves your logistics network
- Own the cluster behind your planning and forecasting models
- Run computer vision for a multi-site network
- Keep sensitive data on your own hardware
Power and space for an 8-GPU server
| System | GPU memory (total) | Max power | Rack space |
|---|---|---|---|
| DGX H100 (8× H100) | 640 GB | ≈ 10.2 kW | 8U |
| DGX B200 (8× B200) | 1,440 GB | ≈ 14.3 kW | 10U |
At 24p per kWh, a server averaging 12 kW uses about 105,000 kWh a year, roughly £25,000 of electricity before cooling. Make sure your comms room or colocation contract can supply and cool that load.
Source: NVIDIA DGX specifications. OEM servers with the same GPUs have similar figures.
| Service | Typical range | Unit | Basis |
|---|---|---|---|
| 8× H100 HGX server, new | £188,000–£240,000 | per server | Fully configured; converted from USD |
| 8× B200 / B300 server, new | £300,000–£415,000 | per server | Fully configured; converted from USD |
Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.
How we estimate carbon here
We use 0.17 kgCO₂e per GPU-hour (GPU-hour on the UK grid (estimate), ActivoGo estimate using DESNZ 2026), multiplied by the GPU-hours in your quote. Renewable contracts and PPAs can lower the market-based figure. It is an estimate for comparison, not a verified figure. Read the methodology.
Buy, own, rent, lease or contract?
Ways to get new GPU servers
Busy GPUs for 3+ years
Capex
Watch: Upfront capex, depreciation and obsolescence. You still need space, power, cooling and people to run it.
Same hardware, paid monthly
Opex or capex, monthly
Watch: Know whether it is an operating (FMV) or finance lease, what happens at end of term, and who carries residual-value risk.
Typical offers we request quotes from
Supplier names stay private until you choose a quote. One request goes to the suitable suppliers for your route, location and needs.
NVIDIA Elite partner
HGX and RTX PRO servers with proof of concept
- Free proof-of-concept
- Installation and networking
- 3-year warranty
UK server builder
Configurable GPU servers up to 8× HGX
- Configure online
- NVIDIA Elite partner
- Custom builds
HPC and AI integrator
DGX and custom GPU systems
- R&D lab testing
- Tailored configurations
- Enterprise support
Offers describe the types of supplier we invite to quote. Prices are indicative and subject to supplier confirmation, availability and terms.
More in compute hardware
Refurbished GPUs
Previous-generation data-centre GPUs and servers, tested and warrantied, at a fraction of new prices. Well suited to inference and fine-tuning.
ExploreGPU leasing
Spread the cost of servers, storage and networking over a fixed term, refresh to new GPUs, and keep cash for the rest of the business.
ExploreEdge AI servers
Compact GPU servers that sit in your warehouse, yard or depot to run vision, robotics and automation with low latency, even if the internet drops.
ExploreFrequently asked questions
Are prices in pounds?
UK integrators usually quote in pounds. Our benchmarks convert dollar market prices at about $1.33 to £1.
Ready to compare quotes?
One short form. Suitable suppliers. Quotes in your inbox.
