Data centres
High-Density AI Colocation
Racks built for GPU servers: high power per rack, liquid or rear-door cooling, and floors strong enough to carry them.
Power per rack: traditional IT vs AI
Why it pays at high utilisation
If your GPUs are busy most of the time, owning or leasing servers and hosting them in colocation often costs well under half of renting the same capacity in the cloud. The trade-off is commitment and running the hardware.
Check the facility can really take it
- Power per rack and per hall, not just per building
- Cooling type and supported GPU platforms
- Floor loading for heavy racks
- Power usage effectiveness (PUE), ideally 1.3 or lower
- Renewable supply and heat reuse
How it serves your logistics network
- Host the GPU servers behind your planning and vision models
- Cut cloud spend once AI workloads are steady
- Keep models close to UK customer and shipment data
Which cooling suits which density?
| Method | Roughly suits | Notes |
|---|---|---|
| Air (hot/cold aisle) | Up to about 15–25 kW per rack | Standard in most facilities |
| Rear-door heat exchanger | About 20–50 kW per rack | Water-cooled door; retrofit friendly |
| Direct-to-chip liquid | 50 kW to 100 kW+ per rack | Coolant to cold plates on the GPUs |
| Immersion | Very high density | Servers sit in dielectric fluid; specialist |
Thresholds are indicative and vary by facility design.
| Service | Typical range | Unit | Basis |
|---|---|---|---|
| High-density racks, 20–50 kW | £230–£340 | per kW per month | Excl. VAT; contracted power |
| Liquid-cooled, 50 kW+ | £300–£420 | per kW per month | Excl. VAT; contracted power |
| 30 kW liquid-cooled rack | £2,000–£5,000 | per rack per month | Excl. VAT; London highest, regions lower |
Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.
How we estimate carbon here
We use 0.131 kgCO₂e per kWh (UK grid electricity (location-based), DESNZ GHG conversion factors 2026), multiplied by the electricity your quote covers. Renewable contracts and PPAs can lower the market-based figure. It is an estimate for comparison, not a verified figure. Read the methodology.
Buy, own, rent, lease or contract?
Ways to get AI-ready colocation
1–5 year terms for owned or leased servers
Opex, committed
Watch: Take-or-pay commitments, early-exit fees and indexation clauses. Match the term to how sure you are of demand.
Build your own hall only at very large scale
Capex, long-term
Watch: Grid-connection lead times, planning consent, construction risk and the skills to operate it.
Typical offers we request quotes from
Supplier names stay private until you choose a quote. One request goes to the suitable suppliers for your route, location and needs.
AI and HPC campus
High-density racks for GPU servers
- Liquid-cooling ready
- Built for AI densities
- Renewable supply
London & Slough operator
High-density suites near the cloud corridor
- Large campuses
- Enterprise and AI suites
- Strong connectivity
Offers describe the types of supplier we invite to quote. Prices are indicative and subject to supplier confirmation, availability and terms.
More in data centres
Racks & cabinets
Space, power and connectivity for your own servers in a professionally run data centre, by the rack or part-rack.
ExploreWholesale & powered suites
A dedicated hall, suite or powered shell from about 1 MW upwards, for large private clouds and AI clusters on 5–15 year terms.
ExploreModular edge DCs
A complete small data centre in a shipping-container-sized module: racks, power, cooling and security, delivered to your depot or yard.
ExploreFrequently asked questions
What density do 8-GPU servers need?
A modern 8-GPU server draws roughly 10–15 kW, so two to four per rack quickly needs 30–60 kW and usually liquid cooling.
Ready to compare quotes?