Racks built for GPU servers: high power per rack, liquid or rear-door cooling, and floors strong enough to carry them.

Power density

Power per rack: traditional IT vs AI

Typical enterprise rack≈ 5–10 kW
One 8-GPU H100 serverDGX H100 max system power≈ 10 kW
One 8-GPU B200 serverDGX B200 max system power≈ 14 kW
Four 8-GPU servers in one rack≈ 40–60 kW
Rack-scale system (e.g. GB200 NVL72)Liquid-cooled≈ 120 kW+
Server figures from NVIDIA specifications. Real draw depends on workload and configuration.

Why it pays at high utilisation

If your GPUs are busy most of the time, owning or leasing servers and hosting them in colocation often costs well under half of renting the same capacity in the cloud. The trade-off is commitment and running the hardware.

Check the facility can really take it

  • Power per rack and per hall, not just per building
  • Cooling type and supported GPU platforms
  • Floor loading for heavy racks
  • Power usage effectiveness (PUE), ideally 1.3 or lower
  • Renewable supply and heat reuse

How it serves your logistics network

  • Host the GPU servers behind your planning and vision models
  • Cut cloud spend once AI workloads are steady
  • Keep models close to UK customer and shipment data
Cooling

Which cooling suits which density?

MethodRoughly suitsNotes
Air (hot/cold aisle)Up to about 15–25 kW per rackStandard in most facilities
Rear-door heat exchangerAbout 20–50 kW per rackWater-cooled door; retrofit friendly
Direct-to-chip liquid50 kW to 100 kW+ per rackCoolant to cold plates on the GPUs
ImmersionVery high densityServers sit in dielectric fluid; specialist

Thresholds are indicative and vary by facility design.

Indicative prices
ServiceTypical rangeUnitBasis
High-density racks, 20–50 kW£230–£340per kW per monthExcl. VAT; contracted power
Liquid-cooled, 50 kW+£300–£420per kW per monthExcl. VAT; contracted power
30 kW liquid-cooled rack£2,000–£5,000per rack per monthExcl. VAT; London highest, regions lower

Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.

How we estimate carbon here

We use 0.131 kgCO₂e per kWh (UK grid electricity (location-based), DESNZ GHG conversion factors 2026), multiplied by the electricity your quote covers. Renewable contracts and PPAs can lower the market-based figure. It is an estimate for comparison, not a verified figure. Read the methodology.

Buy, own, rent, lease or contract?

Ways to get AI-ready colocation

Contract

1–5 year terms for owned or leased servers

Opex, committed

Watch: Take-or-pay commitments, early-exit fees and indexation clauses. Match the term to how sure you are of demand.

Build & own

Build your own hall only at very large scale

Capex, long-term

Watch: Grid-connection lead times, planning consent, construction risk and the skills to operate it.

How to choose

Typical offers we request quotes from

Supplier names stay private until you choose a quote. One request goes to the suitable suppliers for your route, location and needs.

Offer A

AI and HPC campus

High-density racks for GPU servers

Indicative price
~£230–£420 per kW per month
Timing
Weeks to months
Coverage
Harlow and West London
  • Liquid-cooling ready
  • Built for AI densities
  • Renewable supply
Request this quote
Offer B

London & Slough operator

High-density suites near the cloud corridor

Indicative price
~£230–£420 per kW per month
Timing
Months, power permitting
Coverage
London and Slough
  • Large campuses
  • Enterprise and AI suites
  • Strong connectivity
Request this quote

Offers describe the types of supplier we invite to quote. Prices are indicative and subject to supplier confirmation, availability and terms.

More in data centres

Frequently asked questions

What density do 8-GPU servers need?

A modern 8-GPU server draws roughly 10–15 kW, so two to four per rack quickly needs 30–60 kW and usually liquid cooling.

Ready to compare quotes?

One short form. Suitable suppliers. Quotes in your inbox.

Get quotes