Grid Connections & Capacity Upgrades

More capacity for chargers, automation and data rooms. Compare your network operator with independent connection providers and IDNOs.

Routes

Three routes to a new or bigger connection

DNO does it allDistribution network operator
  • Design, build and connect
  • Single point of contact
ICP + DNOIndependent connection provider
  • ICP builds contestable works
  • DNO does non-contestable works
  • Often faster or cheaper
IDNO adoptionIndependent network operator
  • IDNO adopts and runs the new network
  • May pay an asset value
Ask for quotes from more than one route for anything beyond a small connection.

Why it is the critical path

Depot electrification and on-site compute often need more power than a site has. Large connections can wait years in the GB queue, so the earlier you apply, the better.

Independent options

  • An ICP can design and build the contestable works, often faster
  • An IDNO can adopt and own the new network, sometimes paying an asset value back
  • Private wire can link on-site or neighbouring generation
  • Flexible connections may connect you sooner if you accept limits at peak

How it serves your logistics network

  • Upgrade a depot for HGV charging
  • Power a new automated DC
  • Connect an edge data centre or GPU room
Reform

What changed in the connections queue

In April 2025 Ofgem approved reforms to Great Britain’s grid connection process, moving from "first come, first served" towards prioritising projects that are ready to build and needed by the system. The changes mainly affect large generation, storage and demand projects that need transmission-level studies. Smaller demand connections such as depot chargers go through the distribution network operator.

  • Ask your DNO for a budget estimate before committing to a site plan.
  • Check whether a flexible or timed connection would get you connected sooner.
  • Charger management and batteries can reduce the capacity you need.

Sources: Ofgem, NESO. Timescales vary by region and voltage.

Indicative prices
ServiceTypical rangeUnitBasis
Small commercial connection£500–£3,000per connectionExcl. VAT; 5–20 working days typical
Medium commercial connection£2,000–£15,000per connectionExcl. VAT
HV connection to major reinforcement£50,000–£2,000,000per projectHighly site-specific

Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.

Buy, own, rent, lease or contract?

Ways to get grid connections

Contract

DNO, ICP or IDNO connection offer

Opex, committed

Watch: Take-or-pay commitments, early-exit fees and indexation clauses. Match the term to how sure you are of demand.

Build & own

Private wire or self-built HV assets

Capex, long-term

Watch: Grid-connection lead times, planning consent, construction risk and the skills to operate it.

How to choose

Typical offers we request quotes from

Supplier names stay private until you choose a quote. One request goes to the suitable suppliers for your route, location and needs.

Offer A

ICP with in-group IDNO

Connections up to 132 kV for depots and data centres

Indicative price
Quoted
Timing
Months to years
Coverage
All DNO areas
  • NERS accredited
  • Asset adoption
  • Private wire
Request this quote
Offer B

IDNO and grid consultancy

Adopted networks and connection strategy

Indicative price
Quoted
Timing
Months
Coverage
Great Britain
  • IDNO adoption
  • Grid consultancy
  • Microgrids
Request this quote

Offers describe the types of supplier we invite to quote. Prices are indicative and subject to supplier confirmation, availability and terms.

More in energy assets

Frequently asked questions

What is the difference between a DNO, ICP and IDNO?

The DNO runs the local network. An ICP is an accredited contractor that builds new connections. An IDNO owns and operates last-mile networks that plug into the DNO.