Energy assets
Depot EV Charging for Vans & HGVs
Chargers at your depot for electric vans and trucks, owned outright or provided as a service, sized to your shifts and grid connection.
Time to add 100 kWh at different charger powers
Depot charging does most of the work
Around 80–90% of electric HGV charging is expected to happen at the depot, overnight or between shifts. Public hubs fill the gaps on long routes.
Plan in this order
- Duty cycles and dwell times for each vehicle
- Grid capacity and upgrade lead time
- Charger mix: AC for vans, DC for trucks
- Load management, batteries and solar
- Funding: grant, buy, lease or charging-as-a-service
Charging-as-a-service
Some providers install and operate chargers at your depot with no upfront cost and charge per kWh or per month. Some also let you sell spare capacity to other fleets.
How it serves your logistics network
- Charge electric vans overnight
- Run electric HGVs on trunking routes
- Share spare depot capacity with other fleets
Energy and emissions for 20,000 km a year in a van
| Electric van | Diesel van | |
|---|---|---|
| Energy used | ≈ 5,000 kWh (0.25 kWh/km) | ≈ 1,600 litres (8 l/100 km) |
| Emissions | ≈ 0.66 tCO₂e (UK grid) | ≈ 4.1 tCO₂e |
| Licence | Category B up to 4,250 kg for alternatively fuelled vans | Category B up to 3,500 kg |
Illustrative consumption. Factors: DESNZ 2026 (grid 0.131 kgCO₂e/kWh, diesel 2.58 kgCO₂e/litre).
| Service | Typical range | Unit | Basis |
|---|---|---|---|
| 22 kW AC charger, installed | £1,800–£3,500 | per socket | Excl. VAT, grid upgrades and grants |
| 50 kW DC rapid charger | £14,000–£35,000 | per unit | Installed; excl. VAT and grid upgrades |
| 150 kW DC charger (HGV depot) | £45,000–£80,000 | per unit | Installed; excl. VAT and grid upgrades |
| 10-truck HGV depot, all-in | £650,000–£1,400,000 | per site | Equipment, civils, HV connection and load management |
Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.
How we estimate carbon here
We use 0.131 kgCO₂e per kWh (UK grid electricity (location-based), DESNZ GHG conversion factors 2026), multiplied by the electricity your quote covers. Renewable contracts and PPAs can lower the market-based figure. It is an estimate for comparison, not a verified figure. Read the methodology.
Buy, own, rent, lease or contract?
Ways to get depot charging
With grant support and a long depot lease
Capex
Watch: Upfront capex, depreciation and obsolescence. You still need space, power, cooling and people to run it.
Spread hardware cost
Opex or capex, monthly
Watch: Know whether it is an operating (FMV) or finance lease, what happens at end of term, and who carries residual-value risk.
Charging-as-a-service, no capex
Opex, committed
Watch: Take-or-pay commitments, early-exit fees and indexation clauses. Match the term to how sure you are of demand.
Typical offers we request quotes from
Supplier names stay private until you choose a quote. One request goes to the suitable suppliers for your route, location and needs.
Fleet electrification provider
Depot electrification on a financed model
- Chargers, batteries and power
- Operated for you
- HGV and bus experience
HGV charging specialist
Depot Charging as a Service
- No upfront capex
- Sell spare capacity to other fleets
- Fleet card payments
Fleet charging installer
High-power DC charging for logistics depots
- 100–400 kW DC
- Multi-site delivery
- Grant support
Offers describe the types of supplier we invite to quote. Prices are indicative and subject to supplier confirmation, availability and terms.
More in energy assets
Rooftop solar
Solar panels on warehouse, depot and office roofs, bought outright or funded through a power purchase agreement.
ExploreBattery storage
Batteries on site to store solar, avoid peak prices, support chargers on a limited grid connection and earn from grid services.
ExploreBackup power
Keep warehouses, cold stores, chargers and data rooms running through outages and grid works, with hired or owned generators and UPS.
ExploreGrid connections
More capacity for chargers, automation and data rooms. Compare your network operator with independent connection providers and IDNOs.
ExploreEnergy monitoring
See exactly where electricity goes across sites, chargers, cold stores and server rooms, so you can cut waste and prove savings.
ExploreFrequently asked questions
How big a grid connection does an HGV depot need?
It depends on charger power and shifts. Ten trucks on 150–200 kW DC chargers can need 1–3 MVA; slower overnight charging needs much less. A survey will confirm.