Prices & Carbon

Buy, Own, Rent, Lease or Contract? A Decision Guide

The same question comes up for containers, GPUs, data-centre space, solar panels and chargers: should you buy it, build it, rent it, lease it or sign a contract? Here is how to decide.

Decision map

How use and time horizon point to a way of buying

OWNRENTCOMMITOccasional useHeavy useUtilisation →MonthsDecade+Time horizon →RentLeaseContractBuyBuild & own
Cash, flexibility and technology change can shift the answer, for example towards leasing GPUs.

Three questions decide most cases

  • How sure are you of the demand, and for how long?
  • How busy will the asset be: occasional, steady or flat-out?
  • Do you need control of the data, location or equipment?

Rent

Best when demand is uncertain or spiky: hiring a container for a season, on-demand GPUs for a pilot, a generator for planned works. You pay the most per unit but carry no long-term risk.

Contract

Best when demand is steady and predictable: reserved GPU clusters, colocation, fixed electricity or a PPA. You commit for a term and get a lower, more certain price. Read the exit and indexation terms.

Lease

Best when you want the asset on your site but not the capex: GPU servers, batteries, chargers or modular data centres. Check whether it is an operating or finance lease and who carries the residual value.

Buy

Best when utilisation is high for years: containers you will keep for more than about two years, GPU servers busy most of the time, solar on a roof you control. Lowest lifetime cost, but you own the risk of obsolescence.

Build & own

Best for large, long-term needs where you control the site: your own solar array, private wire, data hall or grid connection. Highest effort and lead time, especially for grid connections.

Rules of thumb

  • Containers: buy if needed for more than 18–24 months
  • GPUs: rent under ~40% utilisation; contract when steady; buy or lease above ~60–70% for 3+ years
  • Colocation: contract 12–36 months; build only at MW scale
  • Solar: buy if you own the roof long-term; PPA if you want no capex
  • Depot charging: buy with grant support, or charging-as-a-service to avoid capex
Break-even

A simple break-even test

Divide the purchase price by the rental price per period. If you expect to use the asset for longer than the result, and the asset will still be useful by then, buying is likely to cost less.

ExampleBuyRentBreak-even
One H100 GPU, used 24/7£18,800–£30,000£1.90–£3.40 per hourAbout 5,500–15,800 hours (8–22 months)
500 kWp rooftop solar vs on-site PPA£350k–£550kPay per kWh usedOften 4–8 years of savings

Before hosting, power, maintenance and finance costs. Calculated from ActivoGo benchmarks.

Frequently asked questions

Can I ask for quotes on more than one option?

Yes. Choose Not sure in the form and we will ask providers to quote, for example, both rent and contract so you can compare.

More guides

Freight prices

Planning benchmarks for pallets, road haulage, sea and air freight, so you know roughly what to expect before you ask for quotes.

Explore

Storage & fulfilment prices

What UK businesses typically pay for pallet storage, handling and e-commerce fulfilment.

Explore

Container prices

Typical UK prices to buy or hire dry and refrigerated containers, plus what to check before you buy.

Explore

Carbon methodology

A clear explanation of the emission factors and the simple calculation behind the carbon estimates in your quotes.

Explore

Getting accurate quotes

The details that make the biggest difference to quote accuracy, and how to compare quotes fairly.

Explore

Powering logistics automation

Every automated pick, optimised route and AI agent runs on compute, and every GPU runs on power. A practical guide to planning the stack from the warehouse floor to the grid connection.

Explore

GPU & data centre prices

Planning benchmarks for GPU cloud, colocation and GPU hardware in the UK, with what drives the price and how to compare quotes.

Explore

Energy & charging prices

Planning benchmarks for buying power and building energy assets at UK warehouses, depots and data centres.

Explore

Choosing a freight forwarder

What a freight forwarder does, how forwarders charge, and what to check before you hand over your shipment.

Explore

Pallets to Northern Ireland & Ireland

How pallets get from Great Britain to Northern Ireland and the Republic of Ireland, what paperwork applies, and why prices and transit times differ from the mainland.

Explore

All options side by side

Ways to acquire an asset or service
OptionFits whenWatch out forCost profile
RentPay as you go, by the hour, day or month. Nothing to own or maintain.Demand is spiky or uncertain, you are running a pilot, or utilisation would be under about 40%.Highest unit price. Capacity is not guaranteed at peak. Check storage, data egress and minimum terms.Opex, no commitment
ContractCommit to capacity or a price for a fixed term: reserved GPUs, colocation, fixed energy deals or PPAs.Your load is steady and predictable for 1–15 years and you want a lower, fixed unit price.Take-or-pay commitments, early-exit fees and indexation clauses. Match the term to how sure you are of demand.Opex, committed
Lease or financeUse the asset on your own site or in your rack and pay monthly, without buying it outright.You want control of the hardware or equipment but prefer to protect cash and refresh every 2–3 years.Know whether it is an operating (FMV) or finance lease, what happens at end of term, and who carries residual-value risk.Opex or capex, monthly
BuyPurchase the asset outright, new or refurbished, and run it yourself.Utilisation will stay high (roughly 60–70%+) over 3+ years, or you need full control of data and location.Upfront capex, depreciation and obsolescence. You still need space, power, cooling and people to run it.Capex
Build & ownDevelop infrastructure yourself: your own solar array, data hall, private wire or grid connection.You have a large, long-term need, control of the site, and the appetite to manage delivery.Grid-connection lead times, planning consent, construction risk and the skills to operate it.Capex, long-term
SubscribeA monthly or annual plan that buys and retires credits for you, often priced per employee or per tonne.You are a small business that wants a simple, predictable way to start, with certificates for your records.Check exactly which credits are retired, in whose name, and whether the plan supports the claim you want to make.Opex, monthly or annual

Explore

Ready to compare quotes?

One short form. Suitable suppliers. Quotes in your inbox.

Get quotes