Energy
Energy Assets: Solar, Batteries, Charging & Backup
Generate, store and deliver power on your own sites: solar on warehouse roofs, batteries, depot chargers for electric fleets, backup power and grid connections.
A sensible order for depot energy projects
- 1MeasureFirst
Sub-meter loads and get half-hourly data.
- 2Cut wasteQuick wins
Lighting, controls, out-of-hours loads.
- 3Check grid capacityBefore buying kit
Know your agreed capacity and headroom.
- 4Add solar and storageSelf-supply
Size to your daytime load and roof.
- 5Electrify fleet and heatThen
Chargers and heat pumps, managed to the connection.
Choose an option
Rooftop solar
Solar panels on warehouse, depot and office roofs, bought outright or funded through a power purchase agreement.
ExploreBattery storage
Batteries on site to store solar, avoid peak prices, support chargers on a limited grid connection and earn from grid services.
ExploreDepot charging
Chargers at your depot for electric vans and trucks, owned outright or provided as a service, sized to your shifts and grid connection.
ExploreBackup power
Keep warehouses, cold stores, chargers and data rooms running through outages and grid works, with hired or owned generators and UPS.
ExploreGrid connections
More capacity for chargers, automation and data rooms. Compare your network operator with independent connection providers and IDNOs.
ExploreEnergy monitoring
See exactly where electricity goes across sites, chargers, cold stores and server rooms, so you can cut waste and prove savings.
ExploreWarehouse roofs are power stations
A large distribution-centre roof can host hundreds of kilowatts of solar, generating cheap power in the hours when conveyors, lights and chargers run. Batteries carry it into the evening and peak periods.
Start with the grid connection
Chargers, data rooms and automation can quickly outgrow your supply. Check your connection capacity early, because upgrades can take months or years.
Ways to pay
- Buy outright and claim capital allowances
- No-capex PPA: a provider owns the system and sells you the power
- Lease or asset finance
- Charging- or energy-as-a-service for a monthly fee
- Hire for temporary or emergency needs
G98 or G99? The paperwork for on-site generation
| Process | Applies to | What happens |
|---|---|---|
| G98 | Small systems up to 16 A per phase (about 3.68 kW single-phase or 11.04 kW three-phase) | Install, then notify the DNO within 28 days |
| G99 | Anything larger, including most commercial solar and batteries | Apply to the DNO and get approval before connecting |
| Export limitation | Sites where the network has little capacity | An export limit lets you install more without network upgrades |
Source: Energy Networks Association engineering recommendations G98 and G99.
| Service | Typical range | Unit | Basis |
|---|---|---|---|
| Commercial rooftop solar, installed | £700–£1,100 | per kWp | Excl. VAT; falls with system size |
| 500 kWp warehouse roof system | £350,000–£550,000 | per system | Excl. VAT and roof remediation |
| Commercial battery, installed | £350–£700 | per kWh usable | Excl. VAT; larger systems cheaper per kWh |
| Grid-service revenue via aggregator | £30–£90 | per kWh per year | Systems over ~100 kWh; shared with aggregator |
| 22 kW AC charger, installed | £1,800–£3,500 | per socket | Excl. VAT, grid upgrades and grants |
| 50 kW DC rapid charger | £14,000–£35,000 | per unit | Installed; excl. VAT and grid upgrades |
| 150 kW DC charger (HGV depot) | £45,000–£80,000 | per unit | Installed; excl. VAT and grid upgrades |
| 10-truck HGV depot, all-in | £650,000–£1,400,000 | per site | Equipment, civils, HV connection and load management |
| Generator hire, SME sizes | £40–£150 | per day | Weekly and monthly hire cheaper per day; fuel extra |
| Industrial generator hire, 200 kVA+ | From £500 | per day (from) | Delivery, fuel and installation extra |
| Small commercial connection | £500–£3,000 | per connection | Excl. VAT; 5–20 working days typical |
| Medium commercial connection | £2,000–£15,000 | per connection | Excl. VAT |
| HV connection to major reinforcement | £50,000–£2,000,000 | per project | Highly site-specific |
| Sub-metering and monitoring | Quoted on request | per site | Depends on meter count and software |
Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.
How we estimate carbon here
We use 0.131 kgCO₂e per kWh (UK grid electricity (location-based), DESNZ GHG conversion factors 2026), multiplied by the electricity your quote covers. Renewable contracts and PPAs can lower the market-based figure. It is an estimate for comparison, not a verified figure. Read the methodology.
Buy, own, rent, lease or contract?
Ways to get energy assets
Best lifetime value, tax reliefs
Capex
Watch: Upfront capex, depreciation and obsolescence. You still need space, power, cooling and people to run it.
Self-develop larger solar, storage or private wire
Capex, long-term
Watch: Grid-connection lead times, planning consent, construction risk and the skills to operate it.
Spread cost monthly
Opex or capex, monthly
Watch: Know whether it is an operating (FMV) or finance lease, what happens at end of term, and who carries residual-value risk.
PPA or as-a-service, no capex
Opex, committed
Watch: Take-or-pay commitments, early-exit fees and indexation clauses. Match the term to how sure you are of demand.
Temporary, emergency or seasonal
Opex, flexible
Watch: Delivery and collection charges, minimum hire periods and fuel or consumables.
Also in Energy
Frequently asked questions
Can we put solar on a leased warehouse?
Often yes, with landlord consent. A PPA or a landlord-tenant agreement can share the savings.
Are there grants?
The Depot Charging Scheme part-funds depot chargers for fleets with electric vans, HGVs or coaches when a window is open. Other savings come from tax reliefs.