Data centres
Wholesale Data Centre Capacity
A dedicated hall, suite or powered shell from about 1 MW upwards, for large private clouds and AI clusters on 5–15 year terms.
From requirement to energised suite
- 1RequirementMonths 0–1
MW of IT load, density, location, resilience, start date.
- 2Site searchMonths 1–3
Shortlist by available grid capacity and fibre.
- 3TermsMonths 2–6
Term sheet, power pricing, expansion rights.
- 4Fit-outMonths to a year+
Fitted suite, or your own fit-out in a powered shell.
- 5EnergisationPhased
Power delivered in blocks as the suite fills.
Power is the bottleneck
The hardest part of a large data-centre project is a grid connection. Reform of the GB connection queue is under way, but many areas still quote connection dates years away, so existing powered capacity carries a premium.
What to prepare
- IT load profile and ramp over 3–5 years
- Resilience level, for example N+1 or 2N
- Cooling approach and density
- Preferred regions and latency needs
- Budget and term
How it serves your logistics network
- Consolidate group IT and AI into one private cloud
- Host a large training cluster for network planning
- Support a logistics platform serving many customers
What is changing for large UK data-centre projects
- Data centres were designated Critical National Infrastructure in September 2024, giving the sector closer government support during incidents.
- Ofgem approved grid connection reforms in April 2025 that move away from "first come, first served" towards prioritising projects that are ready and needed.
- The government’s AI Opportunities Action Plan (January 2025) introduced AI Growth Zones to speed up planning and power for large AI data centres.
Sources: GOV.UK (DSIT), Ofgem, NESO. Check current timetables for connection offers in your area.
| Service | Typical range | Unit | Basis |
|---|---|---|---|
| Wholesale / powered suite, 1 MW+ | £60–£150 | per kW per month | 5–15 year terms; strongly location and power dependent |
Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.
How we estimate carbon here
We use 0.131 kgCO₂e per kWh (UK grid electricity (location-based), DESNZ GHG conversion factors 2026), multiplied by the electricity your quote covers. Renewable contracts and PPAs can lower the market-based figure. It is an estimate for comparison, not a verified figure. Read the methodology.
Buy, own, rent, lease or contract?
Ways to get wholesale & powered suites
Long leases on existing powered capacity
Opex, committed
Watch: Take-or-pay commitments, early-exit fees and indexation clauses. Match the term to how sure you are of demand.
Build-to-suit with a secured connection
Capex, long-term
Watch: Grid-connection lead times, planning consent, construction risk and the skills to operate it.
Typical offers we request quotes from
Supplier names stay private until you choose a quote. One request goes to the suitable suppliers for your route, location and needs.
UK wholesale campuses
Dedicated halls and build-to-suit
- MW-scale halls
- Long-term leases
- Build-to-suit options
Hyperscale campus operator
Large powered capacity west of London
- Hyperscale-ready power
- Dedicated suites
- Enterprise SLAs
Offers describe the types of supplier we invite to quote. Prices are indicative and subject to supplier confirmation, availability and terms.
More in data centres
Racks & cabinets
Space, power and connectivity for your own servers in a professionally run data centre, by the rack or part-rack.
ExploreAI-ready colocation
Racks built for GPU servers: high power per rack, liquid or rear-door cooling, and floors strong enough to carry them.
ExploreModular edge DCs
A complete small data centre in a shipping-container-sized module: racks, power, cooling and security, delivered to your depot or yard.
ExploreFrequently asked questions
Should we build our own?
Only at large scale with a long horizon and a secured grid connection. For most logistics businesses, leasing wholesale space or retail colocation is faster and lower-risk.
Ready to compare quotes?
One short form. Suitable suppliers. Quotes in your inbox.