Data centres

Wholesale Data Centre Capacity

A dedicated hall, suite or powered shell from about 1 MW upwards, for large private clouds and AI clusters on 5–15 year terms.

Timeline

From requirement to energised suite

  1. 1
    RequirementMonths 0–1

    MW of IT load, density, location, resilience, start date.

  2. 2
    Site searchMonths 1–3

    Shortlist by available grid capacity and fibre.

  3. 3
    TermsMonths 2–6

    Term sheet, power pricing, expansion rights.

  4. 4
    Fit-outMonths to a year+

    Fitted suite, or your own fit-out in a powered shell.

  5. 5
    EnergisationPhased

    Power delivered in blocks as the suite fills.

Where new grid connections are needed, power can be the longest lead item by years.

Power is the bottleneck

The hardest part of a large data-centre project is a grid connection. Reform of the GB connection queue is under way, but many areas still quote connection dates years away, so existing powered capacity carries a premium.

What to prepare

  • IT load profile and ramp over 3–5 years
  • Resilience level, for example N+1 or 2N
  • Cooling approach and density
  • Preferred regions and latency needs
  • Budget and term

How it serves your logistics network

  • Consolidate group IT and AI into one private cloud
  • Host a large training cluster for network planning
  • Support a logistics platform serving many customers
Policy

What is changing for large UK data-centre projects

  • Data centres were designated Critical National Infrastructure in September 2024, giving the sector closer government support during incidents.
  • Ofgem approved grid connection reforms in April 2025 that move away from "first come, first served" towards prioritising projects that are ready and needed.
  • The government’s AI Opportunities Action Plan (January 2025) introduced AI Growth Zones to speed up planning and power for large AI data centres.

Sources: GOV.UK (DSIT), Ofgem, NESO. Check current timetables for connection offers in your area.

Indicative prices
ServiceTypical rangeUnitBasis
Wholesale / powered suite, 1 MW+£60–£150per kW per month5–15 year terms; strongly location and power dependent

Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.

How we estimate carbon here

We use 0.131 kgCO₂e per kWh (UK grid electricity (location-based), DESNZ GHG conversion factors 2026), multiplied by the electricity your quote covers. Renewable contracts and PPAs can lower the market-based figure. It is an estimate for comparison, not a verified figure. Read the methodology.

Buy, own, rent, lease or contract?

Ways to get wholesale & powered suites

Contract

Long leases on existing powered capacity

Opex, committed

Watch: Take-or-pay commitments, early-exit fees and indexation clauses. Match the term to how sure you are of demand.

Build & own

Build-to-suit with a secured connection

Capex, long-term

Watch: Grid-connection lead times, planning consent, construction risk and the skills to operate it.

How to choose

Typical offers we request quotes from

Supplier names stay private until you choose a quote. One request goes to the suitable suppliers for your route, location and needs.

Offer A

UK wholesale campuses

Dedicated halls and build-to-suit

Indicative price
Quoted per kW, long term
Timing
Months
Coverage
UK campuses
  • MW-scale halls
  • Long-term leases
  • Build-to-suit options
Request this quote
Offer B

Hyperscale campus operator

Large powered capacity west of London

Indicative price
Quoted per kW, long term
Timing
Months to years
Coverage
Hayes and other UK sites
  • Hyperscale-ready power
  • Dedicated suites
  • Enterprise SLAs
Request this quote

Offers describe the types of supplier we invite to quote. Prices are indicative and subject to supplier confirmation, availability and terms.

More in data centres

Frequently asked questions

Should we build our own?

Only at large scale with a long horizon and a secured grid connection. For most logistics businesses, leasing wholesale space or retail colocation is faster and lower-risk.

Ready to compare quotes?

One short form. Suitable suppliers. Quotes in your inbox.

Get quotes