Compute hardware

Edge AI Servers for Sites & Depots

Compact GPU servers that sit in your warehouse, yard or depot to run vision, robotics and automation with low latency, even if the internet drops.

Latency

Typical round-trip time to where the model runs

On-site edge serverSame building network≈ 1–5 ms
UK cloud regionFrom a UK site≈ 10–30 ms
US East Coast cloudTransatlantic round trip≈ 70–90 ms
Indicative network round-trip times; processing time is extra. Robots and safety systems usually need on-site inference.

What runs at the edge

  • Camera checks for damage and labels at the dock
  • Pallet and parcel dimensioning
  • Robot and AMR fleet coordination
  • Yard and gate automation with number-plate recognition
  • Safety monitoring around forklifts

Plan for

  • Ventilation and cooling in the comms room
  • UPS and backup power
  • Remote management and updates
  • Network links back to cloud or colocation

How it serves your logistics network

  • Vision at the dock door and on conveyors
  • Coordinate AMRs and robotic picking
  • Gate and yard automation
Use cases

What logistics teams run at the edge

ApplicationWhy on siteTypical input
Dock-door and yard camerasReal-time detection; bandwidthSeveral HD video streams
Parcel dimensioning and OCRConveyor speedImages per parcel
AMR and robot navigationSafety and latencyLidar and cameras
Forklift and pedestrian safetyMust work if the internet dropsCameras and tags

Requirements vary by vendor and number of streams.

Indicative prices
ServiceTypical rangeUnitBasis
GPU-ready edge or rack serverFrom £8,800per server (from)Entry configuration; GPUs extra. Excl. VAT

Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.

How we estimate carbon here

We use 0.131 kgCO₂e per kWh (UK grid electricity (location-based), DESNZ GHG conversion factors 2026), multiplied by the electricity your quote covers. Renewable contracts and PPAs can lower the market-based figure. It is an estimate for comparison, not a verified figure. Read the methodology.

Buy, own, rent, lease or contract?

Ways to get edge AI servers

Buy

Permanent automation at a site

Capex

Watch: Upfront capex, depreciation and obsolescence. You still need space, power, cooling and people to run it.

Lease or finance

Bundle with robotics or WMS projects

Opex or capex, monthly

Watch: Know whether it is an operating (FMV) or finance lease, what happens at end of term, and who carries residual-value risk.

Rent

Trials and seasonal sites

Opex, no commitment

Watch: Highest unit price. Capacity is not guaranteed at peak. Check storage, data egress and minimum terms.

How to choose

Typical offers we request quotes from

Supplier names stay private until you choose a quote. One request goes to the suitable suppliers for your route, location and needs.

Offer ABuy

NVIDIA Elite partner

Edge GPU servers for vision and robotics

Indicative price
Quoted
Timing
Weeks
Coverage
UK-wide
  • Rugged and rack options
  • Robotics expertise
  • On-site install
Request this quote
Offer BBuy

UK server builder

Compact GPU servers for comms rooms

Indicative price
From ~£8,800, GPUs extra
Timing
Weeks
Coverage
UK-wide
  • 1–4 GPU builds
  • Remote management
  • 3-year warranty
Request this quote

Offers describe the types of supplier we invite to quote. Prices are indicative and subject to supplier confirmation, availability and terms.

More in compute hardware

Frequently asked questions

Why not do it all in the cloud?

Latency, bandwidth and resilience. Video from dozens of cameras is expensive to send to the cloud, and a warehouse cannot stop when the link drops.

Ready to compare quotes?

One short form. Suitable suppliers. Quotes in your inbox.

Get quotes