Compute hardware
GPU Leasing & Hardware Finance
Spread the cost of servers, storage and networking over a fixed term, refresh to new GPUs, and keep cash for the rest of the business.
A new GPU generation every one to two years
- 1A1002020
Ampere generation; 40 or 80 GB.
- 2H1002022
Hopper; the workhorse of 2023–24 AI training.
- 3H2002023
Hopper with 141 GB of faster memory.
- 4B200 / B3002024–2025
Blackwell; roughly 180–288 GB per GPU.
- 5Rubin2026
Next generation on NVIDIA’s announced roadmap.
Why terms are short
GPU value falls fastest in the first two years, so lessors price AI servers on shorter terms than ordinary IT. That suits businesses that want to refresh as new generations arrive.
Compare offers on
- Monthly payment and total cost over the term
- Residual value assumed and who carries the risk
- Refresh and upgrade options mid-term
- Insurance, maintenance and return conditions
How it serves your logistics network
- Fund AI hardware alongside fleet and warehouse kit
- Match hardware refresh to contract cycles
- Keep capex for vehicles and buildings
Leases on the balance sheet from 2026
From accounting periods starting on or after 1 January 2026, the amended UK GAAP standard FRS 102 brings most leases onto the lessee’s balance sheet, as IFRS 16 already does. A lease is shown as a right-of-use asset and a lease liability, so the "off balance sheet" appeal of operating leases largely disappears.
| Reporting framework | Lessee accounting |
|---|---|
| IFRS 16 | Most leases on balance sheet (since 2019) |
| FRS 102, including small companies (Section 1A) | Most leases on balance sheet from 1 January 2026 |
| FRS 105 (micro-entities) | Unchanged: lease payments are expensed |
Source: Financial Reporting Council amendments to FRS 102. Exemptions apply for short-term and low-value leases. Ask your accountant.
| Service | Typical range | Unit | Basis |
|---|---|---|---|
| GPU server lease, 24–36 months | Quoted on request | per month | Depends on asset value, term and residual |
Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.
How we estimate carbon here
We use 0.17 kgCO₂e per GPU-hour (GPU-hour on the UK grid (estimate), ActivoGo estimate using DESNZ 2026), multiplied by the GPU-hours in your quote. Renewable contracts and PPAs can lower the market-based figure. It is an estimate for comparison, not a verified figure. Read the methodology.
Buy, own, rent, lease or contract?
Ways to get GPU leasing
Refresh every 2–3 years without capex
Opex or capex, monthly
Watch: Know whether it is an operating (FMV) or finance lease, what happens at end of term, and who carries residual-value risk.
Buy out at end of term if it still earns its keep
Capex
Watch: Upfront capex, depreciation and obsolescence. You still need space, power, cooling and people to run it.
Typical offers we request quotes from
Supplier names stay private until you choose a quote. One request goes to the suitable suppliers for your route, location and needs.
Technology lessor
24–36 month FMV leases for GPU servers
- Operating leases
- Refresh options
- Covers full stack
Offers describe the types of supplier we invite to quote. Prices are indicative and subject to supplier confirmation, availability and terms.
More in compute hardware
New GPU servers
New, warrantied GPU servers configured for training or inference, supplied by UK integrators and NVIDIA partners.
ExploreRefurbished GPUs
Previous-generation data-centre GPUs and servers, tested and warrantied, at a fraction of new prices. Well suited to inference and fine-tuning.
ExploreEdge AI servers
Compact GPU servers that sit in your warehouse, yard or depot to run vision, robotics and automation with low latency, even if the internet drops.
ExploreFrequently asked questions
Is leasing better than renting cloud GPUs?
If utilisation is high and steady, leasing plus colocation usually costs less than cloud. If demand is uncertain, cloud or reserved capacity is lower-risk.