Energy assets
Energy Monitoring & Sub-Metering
See exactly where electricity goes across sites, chargers, cold stores and server rooms, so you can cut waste and prove savings.
From meter data to verified savings
- 1Install sub-metersWeeks
Chargers, refrigeration, HVAC, lighting, servers.
- 2Baseline1–3 months
Half-hourly profile of each load.
- 3Find wasteOngoing
Out-of-hours loads, peaks and faulty kit.
- 4FixQuick wins first
Controls, schedules and maintenance.
- 5VerifyMonthly
Compare with the baseline and report savings.
Quick wins it finds
- Equipment left running out of hours
- Chargers all starting at once and setting peaks
- Cold stores with failing seals or defrost cycles
- Server rooms with poor cooling efficiency
Why it comes first
You cannot size solar, batteries or a PPA well without good data. A few months of sub-metering usually pays for itself in better decisions.
How it serves your logistics network
- Measure kWh per pallet or per parcel
- Track charging cost per vehicle
- Report PUE for server rooms
Energy reporting rules for larger businesses
| Scheme | Who it applies to | What it requires |
|---|---|---|
| ESOS (Phase 4) | Large undertakings: 250+ employees, or turnover over £44m and balance sheet over £38m | Energy audit and action plan; compliance date 5 December 2027 |
| SECR | Large companies and LLPs, and quoted companies | Energy use and emissions in the annual report |
| Smaller businesses | Not covered by ESOS or SECR | Customers and tenders may still ask for this data |
Sources: Environment Agency (ESOS) and GOV.UK (SECR) guidance.
| Service | Typical range | Unit | Basis |
|---|---|---|---|
| Sub-metering and monitoring | Quoted on request | per site | Depends on meter count and software |
Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.
How we estimate carbon here
We use 0.131 kgCO₂e per kWh (UK grid electricity (location-based), DESNZ GHG conversion factors 2026), multiplied by the electricity your quote covers. Renewable contracts and PPAs can lower the market-based figure. It is an estimate for comparison, not a verified figure. Read the methodology.
Buy, own, rent, lease or contract?
Ways to get energy monitoring
Own the meters and software
Capex
Watch: Upfront capex, depreciation and obsolescence. You still need space, power, cooling and people to run it.
Monthly subscription
Opex, no commitment
Watch: Highest unit price. Capacity is not guaranteed at peak. Check storage, data egress and minimum terms.
Bundled with other assets
Opex or capex, monthly
Watch: Know whether it is an operating (FMV) or finance lease, what happens at end of term, and who carries residual-value risk.
Typical offers we request quotes from
Supplier names stay private until you choose a quote. One request goes to the suitable suppliers for your route, location and needs.
Large UK supplier
Half-hourly data and dashboards
- Half-hourly data
- Free tooling
- EV insights
Energy optimisation platform
Monitoring linked to flexibility revenue
- Site dashboards
- Optimisation
- Flexibility revenue
Offers describe the types of supplier we invite to quote. Prices are indicative and subject to supplier confirmation, availability and terms.
More in energy assets
Rooftop solar
Solar panels on warehouse, depot and office roofs, bought outright or funded through a power purchase agreement.
ExploreBattery storage
Batteries on site to store solar, avoid peak prices, support chargers on a limited grid connection and earn from grid services.
ExploreDepot charging
Chargers at your depot for electric vans and trucks, owned outright or provided as a service, sized to your shifts and grid connection.
ExploreBackup power
Keep warehouses, cold stores, chargers and data rooms running through outages and grid works, with hired or owned generators and UPS.
ExploreGrid connections
More capacity for chargers, automation and data rooms. Compare your network operator with independent connection providers and IDNOs.
ExploreFrequently asked questions
Is half-hourly data enough?
For contracts and solar sizing, usually yes. For individual machines or chargers, add sub-meters.
Ready to compare quotes?
One short form. Suitable suppliers. Quotes in your inbox.