Compute hardware
Edge AI Servers for Sites & Depots
Compact GPU servers that sit in your warehouse, yard or depot to run vision, robotics and automation with low latency, even if the internet drops.
Typical round-trip time to where the model runs
What runs at the edge
- Camera checks for damage and labels at the dock
- Pallet and parcel dimensioning
- Robot and AMR fleet coordination
- Yard and gate automation with number-plate recognition
- Safety monitoring around forklifts
Plan for
- Ventilation and cooling in the comms room
- UPS and backup power
- Remote management and updates
- Network links back to cloud or colocation
How it serves your logistics network
- Vision at the dock door and on conveyors
- Coordinate AMRs and robotic picking
- Gate and yard automation
What logistics teams run at the edge
| Application | Why on site | Typical input |
|---|---|---|
| Dock-door and yard cameras | Real-time detection; bandwidth | Several HD video streams |
| Parcel dimensioning and OCR | Conveyor speed | Images per parcel |
| AMR and robot navigation | Safety and latency | Lidar and cameras |
| Forklift and pedestrian safety | Must work if the internet drops | Cameras and tags |
Requirements vary by vendor and number of streams.
| Service | Typical range | Unit | Basis |
|---|---|---|---|
| GPU-ready edge or rack server | From £8,800 | per server (from) | Entry configuration; GPUs extra. Excl. VAT |
Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.
How we estimate carbon here
We use 0.131 kgCO₂e per kWh (UK grid electricity (location-based), DESNZ GHG conversion factors 2026), multiplied by the electricity your quote covers. Renewable contracts and PPAs can lower the market-based figure. It is an estimate for comparison, not a verified figure. Read the methodology.
Buy, own, rent, lease or contract?
Ways to get edge AI servers
Permanent automation at a site
Capex
Watch: Upfront capex, depreciation and obsolescence. You still need space, power, cooling and people to run it.
Bundle with robotics or WMS projects
Opex or capex, monthly
Watch: Know whether it is an operating (FMV) or finance lease, what happens at end of term, and who carries residual-value risk.
Trials and seasonal sites
Opex, no commitment
Watch: Highest unit price. Capacity is not guaranteed at peak. Check storage, data egress and minimum terms.
Typical offers we request quotes from
Supplier names stay private until you choose a quote. One request goes to the suitable suppliers for your route, location and needs.
NVIDIA Elite partner
Edge GPU servers for vision and robotics
- Rugged and rack options
- Robotics expertise
- On-site install
UK server builder
Compact GPU servers for comms rooms
- 1–4 GPU builds
- Remote management
- 3-year warranty
Offers describe the types of supplier we invite to quote. Prices are indicative and subject to supplier confirmation, availability and terms.
More in compute hardware
New GPU servers
New, warrantied GPU servers configured for training or inference, supplied by UK integrators and NVIDIA partners.
ExploreRefurbished GPUs
Previous-generation data-centre GPUs and servers, tested and warrantied, at a fraction of new prices. Well suited to inference and fine-tuning.
ExploreGPU leasing
Spread the cost of servers, storage and networking over a fixed term, refresh to new GPUs, and keep cash for the rest of the business.
ExploreFrequently asked questions
Why not do it all in the cloud?
Latency, bandwidth and resilience. Video from dozens of cameras is expensive to send to the cloud, and a warehouse cannot stop when the link drops.
Ready to compare quotes?
One short form. Suitable suppliers. Quotes in your inbox.
