Compute hardware

New GPU Servers (HGX & RTX PRO)

New, warrantied GPU servers configured for training or inference, supplied by UK integrators and NVIDIA partners.

Memory

GPU memory per card, by generation

A100 80GB80 GB
H10080 GB
H200141 GB
B200180 GB
B300288 GB
More memory per GPU means larger models fit on fewer GPUs. Source: NVIDIA specifications.

Which platform?

  • HGX 8-GPU: training and large-model inference
  • RTX PRO servers: inference, vision and simulation at lower cost
  • Edge servers: 1–4 GPUs for sites and depots

Before you order

  • Confirm hosting, power and cooling are ready
  • Check networking (InfiniBand or Ethernet) for multi-node
  • Ask about proof-of-concept access before buying
  • Agree delivery, installation and support terms

How it serves your logistics network

  • Own the cluster behind your planning and forecasting models
  • Run computer vision for a multi-site network
  • Keep sensitive data on your own hardware
Plan the room

Power and space for an 8-GPU server

SystemGPU memory (total)Max powerRack space
DGX H100 (8× H100)640 GB≈ 10.2 kW8U
DGX B200 (8× B200)1,440 GB≈ 14.3 kW10U

At 24p per kWh, a server averaging 12 kW uses about 105,000 kWh a year, roughly £25,000 of electricity before cooling. Make sure your comms room or colocation contract can supply and cool that load.

Source: NVIDIA DGX specifications. OEM servers with the same GPUs have similar figures.

Indicative prices
ServiceTypical rangeUnitBasis
8× H100 HGX server, new£188,000–£240,000per serverFully configured; converted from USD
8× B200 / B300 server, new£300,000–£415,000per serverFully configured; converted from USD

Planning benchmarks, not quotes. As of November 2026. Excludes VAT unless stated.

How we estimate carbon here

We use 0.17 kgCO₂e per GPU-hour (GPU-hour on the UK grid (estimate), ActivoGo estimate using DESNZ 2026), multiplied by the GPU-hours in your quote. Renewable contracts and PPAs can lower the market-based figure. It is an estimate for comparison, not a verified figure. Read the methodology.

Buy, own, rent, lease or contract?

Ways to get new GPU servers

Buy

Busy GPUs for 3+ years

Capex

Watch: Upfront capex, depreciation and obsolescence. You still need space, power, cooling and people to run it.

Lease or finance

Same hardware, paid monthly

Opex or capex, monthly

Watch: Know whether it is an operating (FMV) or finance lease, what happens at end of term, and who carries residual-value risk.

How to choose

Typical offers we request quotes from

Supplier names stay private until you choose a quote. One request goes to the suitable suppliers for your route, location and needs.

Offer ABuy

NVIDIA Elite partner

HGX and RTX PRO servers with proof of concept

Indicative price
8× H100 ~£188k–£240k
Timing
Weeks
Coverage
UK-wide
  • Free proof-of-concept
  • Installation and networking
  • 3-year warranty
Request this quote
Offer BBuy

UK server builder

Configurable GPU servers up to 8× HGX

Indicative price
From £8,835 configured
Timing
Weeks
Coverage
UK-wide
  • Configure online
  • NVIDIA Elite partner
  • Custom builds
Request this quote
Offer CBuy

HPC and AI integrator

DGX and custom GPU systems

Indicative price
Quoted
Timing
Weeks
Coverage
UK-wide
  • R&D lab testing
  • Tailored configurations
  • Enterprise support
Request this quote

Offers describe the types of supplier we invite to quote. Prices are indicative and subject to supplier confirmation, availability and terms.

More in compute hardware

Frequently asked questions

Are prices in pounds?

UK integrators usually quote in pounds. Our benchmarks convert dollar market prices at about $1.33 to £1.

Ready to compare quotes?

One short form. Suitable suppliers. Quotes in your inbox.

Get quotes